Completed2024

FTTH network modernisation in North SumatraNorth Sumatra

FTTH access network modernisation across around 28 clusters in North Sumatra, carried out from September 2024 to 2025: new ODC and ODP installation, about 233 km of aerial and duct fiber optic cable, and HDPE routes with manual boring.

Region
Sumatra
Location
North Sumatra
Type of work
FTTH
Volume
233 km
Client segment
Operator
Year
2024

Scope of work

  • ADSS aerial cable and 12–144 core duct cable
  • New 7 m and 9 m steel poles
  • Installation of 144/288-core ODCs and 543 ODPs
  • HDPE routes with manual boring and handholes
  • Core splicing, OTB termination and cut-over
  • ODC and ODP grounding

Other projects

Similar work

All projects