Completed2024
FTTH network modernisation in North SumatraNorth Sumatra
FTTH access network modernisation across around 28 clusters in North Sumatra, carried out from September 2024 to 2025: new ODC and ODP installation, about 233 km of aerial and duct fiber optic cable, and HDPE routes with manual boring.
- Region
- Sumatra
- Location
- North Sumatra
- Type of work
- FTTH
- Volume
- 233 km
- Client segment
- Operator
- Year
- 2024
Scope of work
- ADSS aerial cable and 12–144 core duct cable
- New 7 m and 9 m steel poles
- Installation of 144/288-core ODCs and 543 ODPs
- HDPE routes with manual boring and handholes
- Core splicing, OTB termination and cut-over
- ODC and ODP grounding
Other projects