All regions
Java, Bali, Nusa Tenggara, Sulawesi and Sumatra
- Backbone, NRO, FTTH, FTTB and intersite
- Trenching, HDD and cable pulling
- Splicing, OTDR testing and handover documents
- Operations base
- Sidoarjo, East Java
- Period
- 2018–2026
Telecom infrastructure contractor since 2018
Backbone, NRO, FTTH and intersite links, data center connectivity and integrated security systems for operators, TowerCos, ISPs and enterprises. Our field teams work across Java, Bali, Nusa Tenggara and Sulawesi, with permanent project managers in East Java and Sumatra.
Java, Bali, Nusa Tenggara, Sulawesi and Sumatra
Field track record
On this site we list regions and types of work. Client names and project references are available in our company presentation.
Featured project
An integrated security system for a coal-fired power plant site in Pacitan, designed and built by MLJT from the software down to the hardware. Pedestrian access uses two-step verification: an RFID card plus face recognition. Motorcycle and car access uses RFID cards linked to each owner's record, combined with number plate recognition. Cards are issued from a self-service kiosk, similar to an ATM, that reads and writes RFID cards and has a built-in card dispenser.
Ongoing 2026
Working for
Mobile operators, TowerCos, ISPs, state-owned enterprises, government agencies and enterprises
Client list and references are available in our company presentation.
Send the location, estimated length and type of work. Our engineers reply with technical questions or a survey schedule.
Three areas of work. Each one links to projects we have delivered.
Backbone, NRO and access networks from route survey to handover, including the civil works along the route.
Example projects
Connectivity infrastructure for data centers and buildings: fiber building entry, MMR, cabling to the rack and customer access.
Example projects
Security and access systems we design and build ourselves, from the software to the hardware.
Example projects
From the start we have built both networks and systems. Today that work reaches into the data center.
2018–2019
FTTH and FTTB across Greater Surabaya, Gresik and Madura. In the same period we designed and built an integrated security system for a power plant, from the software to the hardware.
2020–2021
Our first projects outside Java in Kupang, followed by Labuan Bajo and the fiber network for the Mandalika Circuit.
2022–2024
Incorporated as a PT (limited company) in 2022. Fiber backbone along railway corridors, network interconnection restoration, and the 167 km NRO route Kediri – Blitar – Malang.
2025–present
Backbone restoration, TowerCo intersite links, and OSP and ISP work for data centers. Our teams are currently active in four regions.
A survey report and route proposal before any work starts.
Our in-house permits team handles agency and community permits along the route.
Regular progress reports with geotagged photos.
Per-core test results with OTDR traces.
Handover documents ready for your procurement team to process.
Legal, tax and company profile documents for vendor registration are sent on request from your procurement team.
Request the company profile and legal documentsPT Mega Lestari Jaringan Telekomunikasi (MLJT) is a telecom infrastructure contractor and system integrator based in Sidoarjo, East Java, Indonesia. It builds fiber optic networks (backbone, NRO, FTTH and intersite links), data center connectivity, and integrated security and access systems. Its field team has worked since 2018; the company was incorporated as a PT in 2022.
MLJT works across Indonesia. Field teams have worked in East Java, Central Java, Bali, West and East Nusa Tenggara and South Sulawesi, with permanent project managers in East Java and Sumatra. The head office is in Sidoarjo, near Surabaya.
MLJT has worked on 36 projects since 2018 and built more than 500 km of fiber route. The largest single route is a new 167 km aerial backbone along the railway corridor from Kediri through Blitar to Malang, with about 3,400 new poles.
Yes. MLJT builds data center and building connectivity: fiber building entry, MMR rooms, cable routes to the rack (T-line), in-building (ISP) cabling and customer access links.
A survey report and route proposal before work starts, permits along the route, progress reports with geotagged photos, per-core OTDR test results, and ATP, as-built and BAST handover documents.
Yes. Use the quote form on this page or email info@mljt.co.id. The team replies in English or Bahasa Indonesia. Projects are carried out in Indonesia.
No. The website lists regions, types of work and field photos. Client names and project references are shared in the company presentation on request.
We are open to splicing technicians, HDD operators and field supervisors. Send your CV and skill certificates to info@mljt.co.id with the subject KARIR.
Tell us about the route and the type of work. Our team will get back to you with technical questions or a survey schedule.
We reply in English or Bahasa Indonesia.