Completed2024

Rail corridor fiber backbone restoration, 8 segmentsSidoarjo – Porong – Bangil – Sukorejo – Lawang

Restoration of a fiber optic backbone along the rail corridor in 8 segments: Sidoarjo – Tanggulangin, three Porong – Bangil segments, Bangil – Sukorejo, and Lawang. The work covered new poles, cable pulling, splicing into the existing network, and end-to-end OTDR testing through to handover.

Region
East Java
Location
Sidoarjo – Porong – Bangil – Sukorejo – Lawang
Type of work
Restoration
Volume
40 km
Client segment
Network provider
Year
2024

Scope of work

  • Foundations dug and cast for approx. 830 poles
  • Approx. 40 km of 48-core fiber cable pulled
  • Bridge hanging
  • Splicing into the existing network at handholes
  • Tracing and repair of break points with jumper cables
  • End-to-end OTDR testing and handover